论工程量清单计价原理
黎广军
(深圳市造价工程师协会会员, 广东 深圳 518031)
摘要: 工程量清单计价与定额计价的根本差异并非计价方法不同而是采购对象的性质不同,前者是工程零部件产品而后者是施工工艺,因此清单计价能有效控制工程造价而定额计价难以控制工程造价。
关键词: 工程量清单; 工程造价; 计价原理
中图分类号: TU723.2 文献标识码: A
On the Principles of Valuation with Bill of Quantity of Construction Works
LI Guang-jun
(A Associator of Shenzhen Cost Engineer Association, Shenzhen 518031, China)
Abstract: The basic difference between the valuation with bill of quantity of construction works and with the ration isn’t the difference of the valuation method but is the difference of the purchase target\'s nature, the former is the project spare part products and the latter is the construction crafts, so the valuation with bill of quantity can control construction cost effectively but the valuation with the ration can\'t control construction cost effectively .
Keywords: bill of quantity of construction works; construction cost; valuation principle
《建设工程工程量清单计价规范》(下称《计价规范》)自2003年7月1日施行至今已经2周年,其成效未如理想,而理论不清晰可能是主要原因之一。本文从工程采购的角度出发,探讨工程量清单计价原理。
1清单计价与定额计价的差异
1.1 “物理肢解”采购与清单计价
当我们无法评估一件商品的价格时,往往就会比较其零部件的价格。例如,两台配置不同的组装电脑无法比价,但可以通过比较主板、显示器等电脑零部件产品的价格来比价,因此,我们会要求电脑装配商列出一张“工程量清单”报价。如果清单中各种零部件的报价都是合理的,这台组装电脑的价格就是合理的;如果某个零部件的价格偏高,我们就会提出质疑。
建设工程是一次性生产的单件性产品,市场上往往没有完全相同的工程可以比价,因而难以建立其商品市场。但门窗等工程零部件产品可以互相比价,因此可采用“物理肢解”方式,在观念上将建设工程肢解为各种工程零部件产品,列出清单进行招标采购和计价。肢解前后的物理总量必须保持一致,不能发生化学变化;清单项目设置既要利于评估和比价,又要便于成本管理。境外造价专业人员称为“测量师”;而“测量”就是忠实反映客观事实,不能带有个人主观意志。例如,沟槽土方以米计量,因为设计图纸并无沟宽、放坡等数据,无以测量土方体积;再例如,马镫不列入钢筋工程量,因其不是设计图纸而是施工方案的内容。
1.2 “工艺肢解”采购与定额计价
定额价格是指定施工方法、施工环境、施工器具的施工工艺价格。定额计价就是将建设工程的施工方案肢解为各种施工工艺,列出清单进行采购和计价。但是,施工方案具有多样性;施工方案不同,施工工艺及其工程量有所不同,工程造价也不相同,所以,定额计价的合同价是不确定的。以蔬菜采购打个比方,清单计价犹如列出青菜、萝卜的清单进行采购和计价,而定额计价犹如列出“人工栽萝卜苗”、“小毛驴运水浇菜”之类的种菜工艺清单进行采购和计价;如果采用了“人工挑水浇菜”工艺,就可现场签证,按实结算,变更合同价。这就是定额计价无法控制工程造价的根本原因。
1.3 清单计价与定额计价的本质性差异
在定额计价中,业主必然要求采购价廉物美的施工方案而承包商必然要求采用利润最大化的施工方案,双方必然因此发生激烈冲突。在清单计价中,无论采用什么施工方案,清单项目的综合单价不变,因为这是商品单价!招标人应提出工程零部件产品的采购标准、功能、质量等要求,而不能指定与产品质量无关的施工工艺或工程特征,以便形成优胜劣汰的市场经济竞争。
清单计价是采购建设工程本身,而定额计价是采购营造建设工程的某个施工方案;两者的根本差异并非计价方法不相同,而是采购对象的性质不相同。
2 措施项目清单与其它项目清单
2.1 现场临时加工厂与开办费(措施项目) 清单
普通产品在工厂生产。厂房、道路等固定资产的折旧费可以准确地分摊到每一件产品的生产成本中。
内墙抹灰成本应包含脚手架费用,因为这是内墙抹灰的“私用措施”,而外墙脚手架是外墙、外梁、外柱等零部件共用的“公用措施”,难以将其成本分摊给有关零部件,因此应将其列入开办费清单。沟槽土方也是难以分摊其成本的公用措施,但列入工程量清单而不列入开办费清单,因其工程量随基础、管道等零部件产品的工程量变化而变化,并与现场地质有关。
《计价规范》将开办费清单称为“措施项目清单”,但包含了砼产品的模板、支架等私用措施项目,这与国际惯例不相同。在手工计算的低科技时代,砼产品以立方米计量;由于每一立方米砼产品中模板、支架的数量不相同,导致砼产品无法比价,因此模板、支架需要单列计价。如果砼楼板以平方米计量,模板、支架应包含在报价中而无须单列计价;但砼楼板的厚度不同,其价格就不相同,因而会出现许多砼楼板的清单项目。而在高科技时代,这样计量是合理可行的创新。
2.2 工程索赔与其它项目清单
建设工程在现场生产,存在不可预见风险,并有技术复杂、建设期%
黎广军
(深圳市造价工程师协会会员, 广东 深圳 518031)
摘要: 工程量清单计价与定额计价的根本差异并非计价方法不同而是采购对象的性质不同,前者是工程零部件产品而后者是施工工艺,因此清单计价能有效控制工程造价而定额计价难以控制工程造价。
关键词: 工程量清单; 工程造价; 计价原理
中图分类号: TU723.2 文献标识码: A
On the Principles of Valuation with Bill of Quantity of Construction Works
LI Guang-jun
(A Associator of Shenzhen Cost Engineer Association, Shenzhen 518031, China)
Abstract: The basic difference between the valuation with bill of quantity of construction works and with the ration isn’t the difference of the valuation method but is the difference of the purchase target\'s nature, the former is the project spare part products and the latter is the construction crafts, so the valuation with bill of quantity can control construction cost effectively but the valuation with the ration can\'t control construction cost effectively .
Keywords: bill of quantity of construction works; construction cost; valuation principle
《建设工程工程量清单计价规范》(下称《计价规范》)自2003年7月1日施行至今已经2周年,其成效未如理想,而理论不清晰可能是主要原因之一。本文从工程采购的角度出发,探讨工程量清单计价原理。
1清单计价与定额计价的差异
1.1 “物理肢解”采购与清单计价
当我们无法评估一件商品的价格时,往往就会比较其零部件的价格。例如,两台配置不同的组装电脑无法比价,但可以通过比较主板、显示器等电脑零部件产品的价格来比价,因此,我们会要求电脑装配商列出一张“工程量清单”报价。如果清单中各种零部件的报价都是合理的,这台组装电脑的价格就是合理的;如果某个零部件的价格偏高,我们就会提出质疑。
建设工程是一次性生产的单件性产品,市场上往往没有完全相同的工程可以比价,因而难以建立其商品市场。但门窗等工程零部件产品可以互相比价,因此可采用“物理肢解”方式,在观念上将建设工程肢解为各种工程零部件产品,列出清单进行招标采购和计价。肢解前后的物理总量必须保持一致,不能发生化学变化;清单项目设置既要利于评估和比价,又要便于成本管理。境外造价专业人员称为“测量师”;而“测量”就是忠实反映客观事实,不能带有个人主观意志。例如,沟槽土方以米计量,因为设计图纸并无沟宽、放坡等数据,无以测量土方体积;再例如,马镫不列入钢筋工程量,因其不是设计图纸而是施工方案的内容。
1.2 “工艺肢解”采购与定额计价
定额价格是指定施工方法、施工环境、施工器具的施工工艺价格。定额计价就是将建设工程的施工方案肢解为各种施工工艺,列出清单进行采购和计价。但是,施工方案具有多样性;施工方案不同,施工工艺及其工程量有所不同,工程造价也不相同,所以,定额计价的合同价是不确定的。以蔬菜采购打个比方,清单计价犹如列出青菜、萝卜的清单进行采购和计价,而定额计价犹如列出“人工栽萝卜苗”、“小毛驴运水浇菜”之类的种菜工艺清单进行采购和计价;如果采用了“人工挑水浇菜”工艺,就可现场签证,按实结算,变更合同价。这就是定额计价无法控制工程造价的根本原因。
1.3 清单计价与定额计价的本质性差异
在定额计价中,业主必然要求采购价廉物美的施工方案而承包商必然要求采用利润最大化的施工方案,双方必然因此发生激烈冲突。在清单计价中,无论采用什么施工方案,清单项目的综合单价不变,因为这是商品单价!招标人应提出工程零部件产品的采购标准、功能、质量等要求,而不能指定与产品质量无关的施工工艺或工程特征,以便形成优胜劣汰的市场经济竞争。
清单计价是采购建设工程本身,而定额计价是采购营造建设工程的某个施工方案;两者的根本差异并非计价方法不相同,而是采购对象的性质不相同。
2 措施项目清单与其它项目清单
2.1 现场临时加工厂与开办费(措施项目) 清单
普通产品在工厂生产。厂房、道路等固定资产的折旧费可以准确地分摊到每一件产品的生产成本中。
总共2页 1 [2]
下一页
内墙抹灰成本应包含脚手架费用,因为这是内墙抹灰的“私用措施”,而外墙脚手架是外墙、外梁、外柱等零部件共用的“公用措施”,难以将其成本分摊给有关零部件,因此应将其列入开办费清单。沟槽土方也是难以分摊其成本的公用措施,但列入工程量清单而不列入开办费清单,因其工程量随基础、管道等零部件产品的工程量变化而变化,并与现场地质有关。
《计价规范》将开办费清单称为“措施项目清单”,但包含了砼产品的模板、支架等私用措施项目,这与国际惯例不相同。在手工计算的低科技时代,砼产品以立方米计量;由于每一立方米砼产品中模板、支架的数量不相同,导致砼产品无法比价,因此模板、支架需要单列计价。如果砼楼板以平方米计量,模板、支架应包含在报价中而无须单列计价;但砼楼板的厚度不同,其价格就不相同,因而会出现许多砼楼板的清单项目。而在高科技时代,这样计量是合理可行的创新。
2.2 工程索赔与其它项目清单
建设工程在现场生产,存在不可预见风险,并有技术复杂、建设期%